    Dredge Option


    Article summary

    The dredge option allows simulated dredging of any part of the model either at a specified rate or to a given level. The start and completion times of the dredging operations are also variable. This option can be specified in any location after the General System Parameters.

    In order to use the option when method 2 or 3 is used for bed updating, the character 'D' must be placed in the 'filename.dat' cross section data to define the lateral limits of dredging. The first 'D' is placed in column 41 at the data line which defines the left bank extreme of dredging and a second 'D' is placed in column 41 of the line which defines the right bank extreme. Cross section points at and between the 'D's will be lowered (Figure 8 ).

    The 'D' markers should not be placed at the extreme edges of a section, especially when dredging to a level is specified. Otherwise dredging will result in the channel shape being lost altogether and a horizontal bed at the dredged level will be produced.

    If method 1 is used for bed update, then the 'D' markers are not required because dredging is assumed to apply uniformly across the whole section. When dredging to a level, the level specified is the minimum elevation in the section.

    SedimentTransportimagesimage149.jpg

    Dredging can be specified for cross sections at upstream boundaries or immediately downstream from junctions or structures. Dredging at these locations will affect the cross-section shape and the flow predictions, but it will not affect the sediment balance due to the algorithm used to relate sediment loads with bed level changes (see under 'Sediment continuity equation' earlier in the manual). An example of the structure of this section of the file is shown in the figure below.

    SedimentTransportimagesimage151.jpg

    Datafile Format - Dredge Option

    Line 1                                                      keyword 'DREDGE'

    Line 2                                                      n1, itype, [tm]

    Line 2                                                      labeli, start_time, end_time, itype_value

    Where

    n1 = number of ensuing node labels

    itype = integer defining the method of dredging. Enter one of the following:

    1 dredge to constant level

    2 dredge at constant rate

    tm = optional keyword or value for units of time in following data set. Can be any numerical multiplier or one of the following: seconds (default), minutes, hours, days, weeks, months (30 days) or years.

    labeli= node labels of dredged sections

    start_time= start time of dredging in units of tm

    end_time= end time of dredging in units of tm

    itype_value= if itype = 1, required bed level in m

    if itype = 2, dredge rate in m/time (in units of tm)


    Was this article helpful?

    Changing your password will log you out immediately. Use the new password to log back in.
    First name must have atleast 2 characters. Numbers and special characters are not allowed.
    Last name must have atleast 1 characters. Numbers and special characters are not allowed.
    Enter a valid email
    Enter a valid password
    Your profile has been successfully updated.
    ESC

    Eddy AI, facilitating knowledge discovery through conversational intelligence